Home Tags Gadag new electronic

Tag: Gadag new electronic

SWR commissions double line from Ballari to Hubballi

0
At Gadag new Electronic Interlocking with 149 routes has been commissioned at 4.00 hrs. This replaces end cabin system at Gadag. At Kanginhal Station new Electronic Interlocking was commissioned at 5.10 hrs. This was a small 3 block section single line patch and with this, doubling is now through between Hosapete to Hubballi /Hubballi byepass which has tremendous operational benefits.
- Advertisement -

MOST POPULAR

HOT NEWS